Skip to main content

Posts

Showing posts with the label WCT Holdings

Featured Post

Market Daily Report: Bursa Malaysia Ends Nearly Flat As Construction Stocks Attract Buying

 KUALA LUMPUR, Sept 8 (Bernama) -- Bursa Malaysia closed almost flat on Tuesday as buying interest rotated away from index heavyweights towards smaller-cap construction stocks, with sentiment affected by geopolitical uncertainty, said an analyst. At 5 pm, the FTSE Bursa Malaysia KLCI (FBM KLCI) eased 0.39 of a point to 1,714.40 from Monday’s close of 1,714.79. The benchmark index opened 1.65 points lower at 1,713.14 and moved between 1,710.44 and 1,714.50 throughout the trading session. The broader market was almost evenly balanced, with decliners leading gainers 548 to 546, while 598 counters were unchanged, 1,107 were untraded and 25 were suspended. Turnover expanded to 4.13 billion units valued at RM3.14 billion from 3.60 billion units valued at RM2.45 billion on Monday.

Brokers Report: WCT Holdings - secures RM1.29 bil Pan Borneo job

Maintain Outperform with unchanged SOTP-derived TP of RM1.80.  WCT Holdings WCT Holdings Berhad , via its joint-venture with KKB Engineering Berhad, secured one of the Pan Borneo packages worth RM1.29bn. This job win, which is the Group’s first in FY16, is expected to take 51 months from now to complete. WCT owns 30% of the JV, with the remaining owned by KKB Engineering Berhad. As such, its net stake of c.RM390m is within our replenishment rate of RM2bn p.a. for the Group. This job win is estimated to raise the Group’s outstanding orderbook to RM4.8bn. ensuring earnings visibly for the next few years. Maintain Outperform with SOP-derived TP of RM1.80. RM1.29bn Pan Borneo Package . The scope of works, among others includes upgrading of Pan Borneo Highway in Sarawak which involving Phase 1, spanning from Sungai Arip Bridge to Bintulu Airport junction. The works are including piling works, civil works which includes demolition & site clearance, earthworks, geotechni...